Jump to content

Breydon Bridge Currently Not Operational!


Recommended Posts

Dear all

The Authority has been informed by Peel Ports that Breydon Bridge at Great Yarmouth is currently not operational and cannot be lifted for vessels until further notice.

Kind regards

Tom Waterfall

Digital Communications Officer

Tel: +44 (0) 1603 756034

Twitter: @BroadsAuth

Broads Authority, Yare House, 62-64 Thorpe Road. Norwich NR1 1RY
01603 610734
www.broads-authority.gov.uk

 

Link to comment
Share on other sites

If its not working then its the only way plans or not , that life things change , besides I would have thought the engines would be looking forward to a rest I'm sure she will be opened up at sea .

Link to comment
Share on other sites

I would always plan GY than Lowestoft and the lock. 

Bridges working of course.

Then there is the issue of the lock working? Not that I have heard it isn't. They will still need the rail bridge lifting at Mutford so another little challenge. 

Of course Lowestoft is a good safe haven if it gets rough. Just watch out for the sea cats. They don't take prisoners!:default_biggrin:

Link to comment
Share on other sites

7 hours ago, FairTmiddlin said:

It was a broken traffic barrier, which snapped off in the high winds of early AM 18th January. As soon as this is replaced normal working will be resumed.

 

Isn't the traffic controlled by lights as well as barrier? If so surely it is not beyond the capabilities of the port to stop the traffic with the lights and then wheel out a temporary barrier across the lane to then open the bridge? It might add a minute or so to the road closure, but I cannot see that many bridge lifts being needed at this time of year. Why do they and Network Rail always take the easy option of just announcing the bridge is non operational until further notice.

  • Like 2
Link to comment
Share on other sites

1 hour ago, EastCoastIPA said:

Why do they and Network Rail always take the easy option of just announcing the bridge is non operational until further notice.

I would imagine that the road bridge no I hope the road bridge, is interlocked with the barriers and lights. Just the same as railway bridges and level crossings are. Its time all half barrier's were done away with and replaced with full barriers as well..............

Link to comment
Share on other sites

of course in years gone by, they would have a man there who put a cone in  front of the traffic if the barrier had broken.

but in this modern day and age you just cant trust drivers enough to stop if there wasnt a physical barrier to stop them driving off the edge of the bridge when it was open.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Sponsors

    Norfolk Broads Network is run by volunteers - You can help us run it by making a donation

×
×
  • Create New...

Important Information

For details of our Guidelines, please take a look at the Terms of Use here.