We are up for the week, a nice relaxing time with a couple of small jobs on the list.
Yesterday Pauline found a puddle in the drawer unit under the basin in the rear cabin. I pulled all the drawers out and found a pin hole leak in the Flexi hose to the monoblock mixer tap.
What a pain in the butt it turned out to be. No one had replacement hoses so it needed a new tap.
That meant I had to remove the basin worktop to be able to get to the inset basin, to get the taps out
If I was a small framed contortionist it would have been a struggle, then refit the basin and worktop and reseal the whole lot.
Unfortunately I am too tall, wide and old.
The Sheerline needed the rear door lock replacing, Guess what, they aren't made any more, I found a near match but no luck getting it to fit. Having swapped parts between the two and straighten a few bent bits I managed to refit the original lock back in place. Of course the lever handle set no longer lines up, next job, find a handle set that I can 'adjust' to fit.
As tomorrow's weather is looking good then tools can stay packed away, time for a cruise and lunch.