Jump to content

Somerleyton Bridge Now Operational.


Recommended Posts

Dear All

Urgent Boating News - Somerleyton Swing Bridge is not opening to river traffic.  A technical issue was reported on 11 November 2017 and remedial work is being undertaken.

Kind Regards

Laura Milner

Administrative Officer Operations

Broads Authority

Tel: 01603 756035

Broads Authority, Yare House, 62-64 Thorpe Road. Norwich NR1 1RY
01603 610734
www.broads-authority.gov.uk

Edited by ranworthbreeze
Update given
Link to comment
Share on other sites

8 minutes ago, ZimbiIV said:

A strange question.

Has either bridges stuck in the open position?

paul

Hi Paul,

I think at some time they must have or why the need for the summer/winter rails being left on the bridges, sadly they are not used these  days. Of course the need for the summer and winter rails could have just been preventative maintenance, in all wakes of life preventative maintenance now seems to be a thing of the past.

Regards

Alan

Link to comment
Share on other sites

29 minutes ago, ranworthbreeze said:

Hi Paul,

I think at some time they must have or why the need for the summer/winter rails being left on the bridges, sadly they are not used these  days. Of course the need for the summer and winter rails could have just been preventative maintenance, in all wakes of life preventative maintenance now seems to be a thing of the past.

Regards

Alan

I think you will find out it will never fail in the open state, as this would be a wrong side failure, Heads would sure as hell be put out to sacrificed if this did happen. The mechanical interlocking as well as the electrical interlocking would both need to fail for the bridge to fail in the open position. All railway signaling is done to be failsafe.

As for winter/summer rails, these would be standardish 22' foot rails with the exception of about 2" difference to that 22' to allow for contraction/expansion. These would be used by the platelayers/patrolmen to get the bridge working if stuck due to expansion or contraction, to get the bridge the bridge open. Also bear in mind, the channel rodding/ sognal wires also expand/contract, so it their compensator reach limits again this would stop bridge opening until CS&TE linesman arrived to re set the channel rodding/wire, that is all mechanical. The electrical interlocking is far to complicated to even trying to explain in a single post. 

Regards Charlie

  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Sponsors

    Norfolk Broads Network is run by volunteers - You can help us run it by making a donation

×
×