Jump to content
  • Announcements

    Welcome! New around here? Take a look at the New Members' Guide for some pointers.

    Not a member yet? Sign up here and you can soon be chatting away with friends old and new..

    Check out our Handy Information section if you're after something quickly!

  • If you would like to support the forum, please consider visiting the forum shop, where you can purchase such items as NBN Burgees, Window Stickers, or even a custom Limited Edition Wooden Throttle Control Knob

    Forum Shop

Sign in to follow this  
ranworthbreeze

A47 Road Closure And Bascule Bridge

Recommended Posts

Dear All

Please see the attached ABP Lowestoft port information notice regarding the A47 and Bascule Bridge.

Kind Regards

Laura Milner

Administrative Officer Operations

Broads Authority

Tel: 01603 756035

Broads Authority, Yare House, 62-64 Thorpe Road. Norwich NR1 1RY
01603 610734
 

PORT INFORMATION NOTICE

A47 NORTHBOUND ROAD CLOSURE

All Port Users are advised that the Northbound A47 road is closed at the junction of Commercial Road and Station Square, with diversions in place to the South of the Bascule Bridge. A sink hole has opened up some 75 metres north of the Bascule Bridge. This hole is believed to have been caused as the result of a sewer pipe failure.

The Bascule Bridge remains open to all shipping as normal.

There are some restrictions to road traffic accessing the Inner Harbour area of the Port. Road traffic from the North cannot turn right from Station Square into Commercial Road.

Southbound vehicles must cross the Bascule Bridge and proceed to the A12 Roundabout near Asda where, with permission of the traffic diversion operator, they will be allowed to then proceed back northwards over the Bascule Bridge and to turn left into Commercial Road only.

Vehicles outbound from the Inner Harbour area can exit Commercial Road by turning left/northbound only; they can then use the road network to return Southbound over the Bascule Bridge if required.

This notice will be updated as and when further information is received from the Highways Authorities or other responsible agencies.

Harbour Master

04 June 2019

 

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Sign in to follow this  

  • NBN Mobile App

    Want to use NBN when you're out and about?

    Get our mobile app for Android and iOS!

    Get it on Google Play

×
×
  • Create New...

Important Information

For details of our Guidelines, please take a look at the Terms of Use here.