3 hours ago, gancanny said:

i came through saturday and it was almost clear both ways but it was early evening,  just a heads up david, it is around 8 minutes from sutton bridge to the roundabout at kingslynn but going via wisbech it is 35 minutes providing you get by without problems,     when the work first started it was chaotic so i waited to see how long the queue was,  did a 3 point turn in the road, back to the roundabout and away on the diversion

Sounds a good plan. Thanks. 

Link to comment
Share on other sites

On 15/06/2022 at 22:19, DAVIDH said:

Does anybody know the state of the road works at Sutton Bridge? I'm down from Saturday and just wondering if i should take the Wisbech detour. 

Just come back this afternoon, it's fully open again, no holdup.

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

26 minutes ago, petersjoy said:

Just come back this afternoon, it's fully open again, no holdup.

Thats great if its finished, 2 weeks ahead of schedule. When I came over a week ago the east side looked a long way off from been finished.

Link to comment
Share on other sites

1 hour ago, garryn said:

Thats great if its finished, 2 weeks ahead of schedule. When I came over a week ago the east side looked a long way off from been finished.

Looked finished on the insides so it may be the outside not finished could see some scafolding still up.

Link to comment
Share on other sites

2 hours ago, DAVIDH said:

I'm currently sat in the McDonald's just before. I'll report what it was like when I get to the boat later. 

I'm lovin' it™ :default_norty:

Link to comment
Share on other sites

23 minutes ago, Mouldy said:

Read a post on FB that the road from Acle past the bridge is closed at The Hermitage due to a water leak.  They estimate it will take between 2 and 6 days to fix!

Yes indeed we were there yesterday, and had to take a de tour.Didnt know it was a water leak.

Link to comment
Share on other sites

Ian I have just read that the road closure at Acle may have been lifted this afternoon. Anglian Water have managed to fix the burst main sooner than anticipated. Guessing that might be a better way back to Martham than up through Wroxham if you're out and about at the weekend.

  • Thanks 1
Link to comment
Share on other sites

7 hours ago, SwanR said:

Ian I have just read that the road closure at Acle may have been lifted this afternoon. Anglian Water have managed to fix the burst main sooner than anticipated. Guessing that might be a better way back to Martham than up through Wroxham if you're out and about at the weekend.

The Acle Bridge Inn reported on FB that the roadworks are still there but traffic light controlled now.  I haven’t been through, so unsubstantiated, but as the road closure must have impacted their non boat trade, I guess they’ve an interest in reporting the current status.

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

For details of our Guidelines, please take a look at the Terms of Use here.