guywilkes Posted April 26 Share Posted April 26 Our winter work was completed last week and after a very windy trip to our home mooring, we are almost ready for the season (I hope it warms up soon - I've had the heater taken out!). This years work included replacing 4 ribs on the port side and 2 ribs on the starboard side, replacing a bearer under the cockpit, taking out a grp moulded shower tray that was causing issues and remaking of the heads floor in wood, strip back of the toe rails and making good, Varnishing the transom and renewing signwriting, replacement of 4 teak roof veneers, fixing of a leaking brass roof vent, replacement timbers on the starboard side, removing a redundant water tank and lots of other small jobs. Oh and a complete hull repaint!! The team at Landamores have done a fantastic job and here are a few photos. If I may say, she is not looking too bad for her 88th season! 20 1 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.