Jump to content

Winter Work Complete And Now Afloat


Recommended Posts

Our winter work was completed last week and after a very windy trip to our home mooring, we are almost ready for the season (I hope it warms up soon - I've had the heater taken out!). This years work included replacing 4 ribs on the port side and 2 ribs on the starboard side, replacing a bearer under the cockpit, taking out a grp moulded shower tray that was causing issues and remaking of the heads floor in wood, strip back of the toe rails and making good, Varnishing the transom and renewing signwriting, replacement of 4 teak roof veneers, fixing of a leaking brass roof vent, replacement timbers on the starboard side, removing a redundant water tank and lots of other small jobs. Oh and a complete hull repaint!! The team at Landamores have done a fantastic job and here are a few photos. If I may say, she is not looking too bad for her 88th season! 

FB_IMG_1714028621804.jpg

425297854_907319634369394_2964388212024790333_n.jpg

20240412_113645 (2).jpg

FB_IMG_1714028601560.jpg

20240419_161847 (1).jpg

  • Like 20
  • Love 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Sponsors

    Norfolk Broads Network is run by volunteers - You can help us run it by making a donation

×
×
  • Create New...

Important Information

For details of our Guidelines, please take a look at the Terms of Use here.