ranworthbreeze Posted November 26, 2019 Share Posted November 26, 2019 Good morning Please find attached ABP Lowestoft Notice to Mariners No 33 2019 Lowestoft Outer Harbour – SSE Pontoon Installation – Waveney Dock. In addition, we have been advised that with reference to NTM No. 32 Notification of dredging activities – the UKD Orca has been delayed, latest ETA is Saturday 30th November – Subject to change. Kind regards. Karen. Karen Tyrrell Administrative Officer Operations Broads Authority Yare House, 62-64 Thorpe Road, Norwich, NR1 1RY Tel: 01603 756035 : karen.tyrrell@broads-authority.gov.uk Broads Authority, Yare House, 62-64 Thorpe Road. Norwich NR1 1RY 01603 610734 LOCAL NOTICE TO MARINERS LOWESTOFT OUTER HARBOUR – SSE PONTOON INSTALLATION – WAVENEY DOCK Mariners and Port Users are advised that a new pontoon will be installed by SSE at the South side of Waveney Dock, adjacent to berth No.2. The new pontoon will be mobilised from Lowestoft Haven Marina hoist dock and towed to the Waveney dock and positioned by the vessel ‘Jumbo’. At both Lowestoft Haven Marina and SSE site, works will involve crane operations – lifting heavy structures and works from a suspended basket. Towing of the pontoons are scheduled for the 26th November and installation of the pontoon is liking to take around 3 days wind/weather permitting. The works are subject to favourable weather conditions and timings may vary. During the works, vessels are requested to transit Waveney Dock at slow speed and not pass too close the works area to minimise affects of vessel wash. Please contact Lowestoft Port Control, VHF Ch 14, Tel. 01502 572286, if additional information is required. Harbour Master 25th November 2019 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.