Jump to content

Broad Ambition - Underway on the H2O


Recommended Posts

  • 2 months later...
5 hours ago, BroadAmbition said:

Just gone through Horning, fenders down,  doh  

Really? 

Maybe they were down in readiness for coming alongside (He's says optimistically)

Griff

Maybe the “Somewhat breezy conditions” mentioned earlier, had blown them overboard.

  • Like 1
  • Haha 1
Link to comment
Share on other sites

JT took 'B.A' through Wroxham bridge last weekend.

The gauge on the downstream side of the bridge stated 6ft3" airdraft.

'B.A' in normal bridge passage configuration is 6ft3" so she should have been scraping through.

He reported 2" clearance

Griff

  • Like 5
  • Thanks 1
Link to comment
Share on other sites

Friday 29th March

Bro’ and crew took ‘B.A’ through Wroxham Bridge with height board stating 6ft2” :default_icon_e_surprised: That’s unusually brave of our Young Un. He had to remove mast completely rather than just folding it down. The rolled back canopy brushed the bridge and windscreen only had 1” to spare. The return journey won’t be as close to HW as he stated he won’t be doing that again in a hurry :facepalm:

They went into the Kings Head now recently refurbished and are impressed 

Griff

  • Like 7
Link to comment
Share on other sites

On 30/03/2024 at 07:49, BroadAmbition said:

Friday 29th March

Bro’ and crew took ‘B.A’ through Wroxham Bridge with height board stating 6ft2” :default_icon_e_surprised: That’s unusually brave of our Young Un. He had to remove mast completely rather than just folding it down. The rolled back canopy brushed the bridge and windscreen only had 1” to spare. The return journey won’t be as close to HW as he stated he won’t be doing that again in a hurry :facepalm:

They went into the Kings Head now recently refurbished and are impressed 

Griff

Kath and I had lunch at The Kings Head yesterday, lunch menu was a little unusual but what we had was delicious. The service was a little chaotic but the staff were pleasant and were trying hard. I’m sure they’ll get the hang of it after a few days

  • Like 3
Link to comment
Share on other sites

Bro' brought 'B.A' back through Wroxham bridge on Sunday this time at 6ft3" stating once again it was far too close, still -  needs must and all that

Sunday overnight at Womack Water, Monday forenoon Sutton for pump out and diesel, where Purdey abandoned Dungraftin and stowed away onboard 'B.A' in full view for the river trip back to wetshed where the crew departed for home

The 12/240v system issue we thought we had cured last month reared its ugly head once again on Sunday evening.

More on this over on t maintenance thread in due course

Griff

  • Like 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...

Important Information

For details of our Guidelines, please take a look at the Terms of Use here.